Some great work was done by all. I just manage a Piñata block.
Now this was a lonng weekend in the west so Squid2 was off on an annual Scouts camp 2hours North of Perth. Thanks to DH for taking him there on Friday otherwise I would have missed the party!
With one Squid1 out the door it was time to repainted Squid2 room as promised!! Full steam ahead to get it done before the end of the weekend. So with DH help we striped the room, filled the gaps, cut in and manage two coats. What a job. All Squids things need to return.
In between painting duties I manage to start a project that I have been eyeing off for a while.
After buying some fabric for Squid1 (which was rejected)! I could not see this lovely fabric (in Mums eyes was just right) go to waste. So I put it to good use.Can you believe it starts with a triangle.
Just need to sandwich and quilt then I can hang it proudly in my craft room. What do you think?
Hugz Sandra




